Walraven Case Study - 17 metre long outdoor pipe support bridge

Back to Blog Listing

Walraven Case Study - 17 metre long outdoor pipe support bridge

The client were building a 23,000 square metre, state-of-the-art headquarters, manufacturing and R&D facility for a specialist cooling systems manufacturer. They required a design solution for a bespoke outdoor pipe support system. A heavy frame modular support system was perfectly suited to this project.

The problem

A bespoke outdoor support system was required to span two buildings at a high level, carrying a mixture of pipelines and electrical containment. The supports had to allow for vehicle access underneath the structure.

he solution

Walraven’s Maxx heavy frame modular support system provided the scale and stability required. The solution was a 4 metres high, 17 metres long bridge. The design allowed for wind loadings and containment weights.

For more information, contact our dedicated Walraven technical team on technical@dpbuildingsystems.co.uk or Click Here